Total-Energo LLC performs comprehensive diagnostics of three-phase GE SG Series UPS (GE Digital Energy SG Series). These are high-performance uninterruptible power supplies with double energy conversion, designed to protect the most critical facilities: data centers (DPC), infrastructure nodes, industrial enterprises, medical institutions, communication and transport systems. SG series systems can be configured from 10 to 640 kVA.
What does professional diagnostics of GE SG UPS include
1. Visual inspection and system analysis
- Checking the housing, ventilation, terminals, cable connections
- Analysis of the front panel, touch display, error messages
- Identification of potentially dangerous conditions or damage
2. Checking input and output parameters
- Measurement of input voltage and frequency on all phases
- Analysis of output voltage stability in online, bypass, battery modes
- Testing switching speed and power continuity
3. Inverter system and static bypass test
- Checking the inverter operation under load
- Transfer to battery in the absence of the network, reverse transfer
- Testing automatic and manual bypass
4. Checking the battery and battery circuit
- Measuring the voltage of the entire battery group, individual blocks
- Checking the condition of cable connections, terminals, thermal protection
- If available, checking data from BMS (Battery Management System)
5. Assessment of cooling systems
- Checking fans, radiators, temperature sensors
- Detection of overheating, dust contamination, changes in cooling capacity
6. Communications and event log
- Reading logs via built-in monitoring or GE software (e.g. Power Insight)
- Analysis of errors, alarms, startup history and transitions between modes
- SNMP, RS232, Modbus TCP/IP test — if available
7. Report and technical recommendations
- Technical conclusion with inspection results
- Identified problems or potential risks
- Suggestions for maintenance, battery replacement, ventilation improvement, software update
When GE SG diagnostics are necessary
- Scheduled maintenance (annually or every 6-12 months for Tier III/IV facilities)
- After 3+ years of operation without battery replacement
- When accidents occur, reserve time decreases, or load changes
- After overheating, power grid damage, facility reconfiguration
Why choose LLC “Total-Energo”
- More than 10 years of experience with GE SG, LP, GT, TLE
- Full technical service: diagnostics, battery replacement, repair, modernization
- Specialized engineers with certification and access to high-voltage systems
- Departure throughout Ukraine, urgent visits to critical facilities
- Official documentation, diagnostic report, system resource forecast